Spacecraft programs need to make critical ADCS, propulsion, sensor, and power trade-offs early, before design lock, but doing those trades thoroughly while maintaining schedule momentum is difficult. When GNC and subsystem models don’t drive early design choices, teams risk discovering compromises late. And when hardware and software integration becomes the pacing item, timing, interface, and performance gaps surface only after full system integration is already underway.